September 2, 1996
Bob Vila prepares to restore his own home by inspecting it inside and out. Also: a tour of Harvard Square with architectural histo...Read more
September 9, 1996
As work begins on the project, Bob Vila offers tips on demolishing a structure. Also: a look at the architect's renovation plans a...Read more
September 16, 1996
As reconstruction begins, the crew corrects a structural flaw with a new beam and starts overhauling the plumbing. Also: a tour of...Read more
September 23, 1996
As structural changes to the roof are planned, Bob Vila presents a guide to shingles. Also: a look at shingles being made in Vancouver factory.
September 30, 1996
Work begins on turning the basement into a combination exercise room and workshop, with Bob Vila sharing tips on concrete slab flo...Read more
October 7, 1996
Bob Vila evaluates progress on the Cambridge, MA, project. Also: a tour of the historic Longfellow House, onetime residence of Geo...Read more
October 14, 1996
Roofers replace the shingles and install copper lining to rebuild the gutters. Meanwhile, an electrician explains the project's ex...Read more
October 21, 1996
Framing begins on the backyard deck, chimney repair gets underway, and the Palladian window is installed in the third-floor family room.
October 28, 1996
Bob Vila explores the various uses of insulation products, including noise reduction. Also: building a deck with proper drainage.
November 4, 1996
Bob Vila oversees the installation of a heating, air-conditioning and ventilation unit. In the bathroom, radiant heat is installed...Read more
November 11, 1996
Bob Vila offers tips on plastering and window installation. Also: a tour of a Stanford White-designed house in Stockbridge, MA.
November 18, 1996
Bob Vila discusses ceramic tile, from design choices to installation. Also: tile shopping in New York City; digging the trench for a water main.
November 25, 1996
Work begins on the grounds as a landscape architect helps formulate plans. Meanwhile, the new deck takes shape and a parking pad i...Read more
December 2, 1996
The crew installs a staircase, then begins repairing plaster and laying in tile. Also: glass is replaced in the doors of the dining-room hutch.
December 9, 1996
Workmen start paneling the dining room and entryway. Also: a visit to the Isaac Bell House in Newport, RI.
December 16, 1996
A hardwood floor is installed; work is done on the dressing rooms in the master bedroom; and a water-purification system is installed in the basement.
December 23, 1996
The exterior paint color is chosen and the necessary prep work needed for the job is assessed. Windows are restored, and in the ki...Read more
December 30, 1996
In conjunction with the installation of the toilet and vanity at the Cambridge, MA, project site, Bob Vila tours the Wisconsin fac...Read more
January 6, 1997
Bob Vila demonstrates the right way to install tile. Also: a look at the prep work needed for the yard landscaping.
January 13, 1997
The landscaping begins. Retaining-wall materials are used to create an elevated terrace and the backyard patio is paved. Also: a p...Read more
January 13, 1997
Landscapers begin planting on the terrace. In the kitchen, new countertops are installed before the sink and a faucet are put in. ...Read more
January 28, 1997
Built-in bookshelves are added to the library. Also: a period light fixture is refurbished, a dimmer-switch system is installed, a...Read more
January 13, 1997
Storm windows are installed, a faux paint finish is applied to walls in the master bedroom, and planting in the yard is completed....Read more
February 10, 1997
Bob Vila meets with the interior designers and discusses the choice of color schemes. Also: a look at the updated basement workshop.
February 17, 1997
An armoire is converted into an entertainment unit, while the kitchen and family room are completed.
February 24, 1997
A look at the fabrics, colors, and furnishings inside the completed house. Also: a lockset is installed in the powder-room door an...Read more