February 4, 2012 • 30m
The new home’s architecture is enhanced with continuity of garage doors, entry doors and shutters as the foundation is covered wit...Read more
February 11, 2012 • 30m
Dean, Miriam, Dan and Bucky pitch in to install a paver driveway, walkway and step veneer.
March 3, 2012 • 30m
Dean, Miriam, and the Hometime crew begin updating the 1970’s remodel of a 1911 kitchen with new windows and a new patio door in the bumpout.
March 10, 2012 • 30m
Double hung windows are updated with new inserts as Hometime guts the kitchen and reframes the powder room for a pocket door.
March 17, 2012 • 30m
Dean and Miriam finish up rough-ins, insulation, drywall and priming to get ready for new cabinets.
March 24, 2012 • 30m
Dean and Miriam show how to blend two different finishes as they install new cabinets.
March 31, 2012 • 30m
Dean and Miriam get the kitchen, mud room and powder room areas ready for new flooring and countertops.
April 7, 2012 • 30m
It’s time for finishing touches as Dean and Miriam trim out the kitchen, mud room and powder room.
April 14, 2012 • 30m
Dean, Miriam and the Hometime crew fire up the fixtures and appliances as they wrap up the project.
April 21, 2012 • 30m
Dean and Miriam look at roofing, stone, garage doors and stamped concrete from the curb appeal perspective as a new home is built.
April 28, 2012 • 30m
Dean and Miriam talk about roofing, railings and a realistic gas fireplace during the construction of a screen porch.
May 5, 2012 • 30m
Dean and Miriam document the construction of two new homes, built inside a home and garden show.
May 12, 2012 • 30m
Dean, Miriam and the crew demo some old kitchen countertops and install new quartz surfaces.
October 6, 2012 • 30m
Finishing a hilly back yard with landscape steps and tile, a fire ring, plants and sprinklers.
October 13, 2012 • 30m
Planting site-appropriate trees after a storm and building a crib for firewood cut and split from the damaged timber.
October 20, 2012 • 30m
Pre-building timber frame walls inside and re-building on a new slab near Hometime Log Cabin.
October 27, 2012 • 30m
Pre-building timber frame style roof trusses inside and re-assembling those on site as shed construction continues.
November 3, 2012 • 30m
Taking out old concrete to repair, reframe and reseal the patio over a storage area.
November 10, 2012 • 30m
Re-pouring and re-stamping the concrete patio while fixing up the storage area below.
November 17, 2012 • 30m
Resetting an outdoor natural stone island, covering it with granite and setting a new built-in gas grill.
November 24, 2012 • 30m
Updating an island kitchen with new cabinets includes visits with the designer and the manufacturer.
December 1, 2012 • 30m
Finishing up the new cabinets for the island kitchen and covering those with new countertops.
December 8, 2012 • 30m
Installing lights, plumbing fixtures and appliances.
December 15, 2012 • 30m
Installing custom carriage house doors and laying a system of tailored pavers.
December 22, 2012 • 30m
Installing clay tile roofing and natural stone cladding for the walls.
December 29, 2012 • 30m
Finishing up the exterior and getting the new shed ready for winter.