February 6, 2010 • 30m
The Hometime crew uses pavers and retaining walls to capture space under a second-story deck.
February 13, 2010 • 30m
The Hometime crew frames and insulates curtain walls to enclose the space under a second-story deck.
February 20, 2010 • 30m
The Hometime crew finishes the space under a second-story deck to expand a workshop used to create metal sculpture.
February 27, 2010 • 30m
The Hometime crew works with surveyors, graders and architects to prepare a building site. Episode one of a thirty part series foc...Read more
March 6, 2010 • 30m
The Hometime crew works with a contractor to excavate for the new house and use poured-in-place insulating concrete forms for the basement walls.
March 13, 2010 • 30m
The Hometime crew helps out as the floors and walls of the house are pre-built in a nearby factory and then quickly assembled at t...Read more
March 20, 2010 • 30m
The Hometime crew watches as the intricate roof framing components for the house are pre-built off-site, assembled on the ground, ...Read more
March 27, 2010 • 30m
The Hometime crew supervises the design, construction and installation of the windows for the home, and explains the natural slate roofing system.
April 3, 2010 • 30m
The Hometime crew prepares for and supervises the installation of the basement, garage and porch floors.
April 10, 2010 • 30m
The Hometime crew manages the installation of the ductwork, recessed lighting, and central vacuum while also helping out with the ...Read more
April 17, 2010 • 30m
The Hometime crew installs cables for lighting control, audio, video and security and helps out with several types of insulation.
April 24, 2010 • 30m
The Hometime crew helps out installing the radiant floor heating system and the geothermal heating and cooling equipment.
September 11, 2010 • 30m
The Hometime crew wraps up a project with a second floor yoga studio for “her” and a garage-level workshop for "him."
September 18, 2010 • 30m
After some last-minute preparation crews install four different types of wall board for the interior walls and ceilings.
September 25, 2010 • 30m
The project house gets sheathing for the floors, extra-tough primer on the walls, and a stained-cedar vaulted ceiling in three high-profile rooms.
October 2, 2010 • 30m
Wooden beams are built outside for the porches. Inside, hardwood trim wainscoting is installed.
October 9, 2010 • 30m
The Hometime crews scopes out how the custom matching garage and entry doors are made, and helps out leveling the floors for tiling.
October 16, 2010 • 30m
The Hometime crew helps out as craftsmen install ceramic and natural stone tile in the bathrooms, natural stone on the fireplace, ...Read more
October 23, 2010 • 30m
The Hometime crew installs the paver driveway, as well as the master bathroom cabinets.
October 30, 2010 • 30m
The Hometime crew works on the interior doors, kitchen cabinets, wainscoting, and exterior columns.
November 6, 2010 • 30m
The Hometime crew installs custom cabinets for the laundry room and starts the home’s wood flooring.
November 13, 2010 • 30m
The home office begins to take shape, as the custom staircase work begins.
November 20, 2010 • 30m
The stone countertops are fabricated and installed.
November 27, 2010 • 30m
The Hometime crew installs cabinets, countertops and landscaping.
January 22, 2011 • 30m
The covered porch gets motorized screens, the garage floor gets an epoxy coating, and the last few cabinets are installed.
January 29, 2011 • 30m
The custom handrail is built, granite countertops are installed, the drip irrigation is wrapped up, and the yard gets sod.