February 7, 2009 • 30m
The Hometime crew re-grades a sloping back yard, installs a drainage system, and begins building a series of paver patios.
February 14, 2009 • 30m
The Hometime crew weaves several retaining walls, steps, and patios into a small, sloped back yard.
February 21, 2009 • 30m
The Hometime crew restores the porch of what was once the caretaker’s home on a 40-acre, turn-of-the-century lakeside estate.
March 7, 2009 • 30m
The Hometime crew renovates a church courtyard with a textured concrete walkway, custom wood benches, and a raised planting bed.
April 4, 2009 • 30m
The Hometime crew makes its last visit to this historic home to create a sidewalk outside and to finish painting and wallpapering the interior.
April 11, 2009 • 30m
The Hometime crew takes a small kitchen and starts work to improve storage and functionality.
April 18, 2009 • 30m
The Hometime crew installs new kitchen cabinets, a new sliding door and new floor tile.
April 25, 2009 • 30m
The Hometime crew installs countertops and appliances, as well as a new wood floor for the adjacent living room.
May 2, 2009 • 30m
The Hometime crew converts an unused, tuck-under garage into a metal-working studio with a new heater and a downsized garage door.
May 9, 2009 • 30m
The Hometime crew wraps up the workshop with doors, windows and welding equipment.
September 5, 2009 • 30m
The Hometime crew installs a super-hard, prefinished wood floor.
September 12, 2009 • 30m
The Hometime crew installs large-format limestone flooring.
September 19, 2009 • 30m
The Hometime crew works with a designer to identify and prioritize a house-wide makeover. Then they begin with the first phase: te...Read more
September 26, 2009 • 30m
The Hometime crew transforms a kitchen with re-faced cabinets along with new counters, tile, appliances and lighting.
October 3, 2009 • 30m
The Hometime crew uses new trim, wood flooring, lighting, paint and furniture to transform a dated, 1970s living room and dining room.
October 10, 2009 • 30m
The Hometime crew installs sheet and tile linoleum on the Hometime log cabin basement floor.
October 17, 2009 • 30m
The Hometime crew modifies and upgrades cabinets, appliances, countertops and plumbing fixtures.
October 24, 2009 • 30m
The Hometime crew adds new cabinets and plumbing fixtures to a log cabin lower level.
October 31, 2009 • 30m
Dean, Miriam and the Hometime crew remove cabinets, asbestos flooring and a concrete slab then ingeniously reinforce sagging walls...Read more
November 7, 2009 • 30m
Dean, Miriam and the Hometime crew rebuild old cabinets and install historically sensitive countertops, flooring, fixtures and app...Read more
November 14, 2009 • 30m
The Hometime crew transforms a bland, unfinished basement by juggling doors and windows, repairing humps and cracks in the floor, ...Read more
November 21, 2009 • 30m
The Hometime crew puts in doors, tile and cabinets for the basement wet bar and peninsula.
November 28, 2009 • 30m
The Hometime crew puts in granite countertops and a trendy shower door then wrap up the custom wood paneling around a basement fireplace.
December 5, 2009 • 30m
The Hometime crew shores up the block walls then uses attic trusses to create a room over a flat-roofed, detached garage.
December 12, 2009 • 30m
The Hometime crew seals up the exterior of the garage and the new studio above it.
December 19, 2009 • 30m
The upstairs studio gets paint, flooring, and lighting. The downstairs garage gets flooring and cabinets.