June 24, 2004 • 50m
First look at the house and plans, with garden designer Ann-Marie giving ideas for planning the front garden. The kitchen removal ...Read more
June 25, 2004 • 50m
Old chimney stack, flue and liner removal, clearing the old kitchen continues, digging the porch foundations, and rear garden desi...Read more
June 28, 2004 • 50m
Staircase removal, plans for the conservatory and garden design, and digging the conservatory foundations. Plus tips on glazing, c...Read more
June 29, 2004 • 50m
Creating a new front entrance and blocking up the old one. Visiting the factory where the new staircase is being built. Plus tips ...Read more
June 30, 2004 • 50m
Pouring the concrete for the conservatory and porch foundations, and work begins on the renovation of the master bedroom with tips...Read more
July 1, 2004 • 50m
Clearing the back garden, removing a fireplace, and building work is started on the porch and conservatory. Plus tips on repairing...Read more
July 2, 2004 • 50m
The new staircase arrives and installing it begins, work starts on updating the brickwork facing of the house, and Phil runs throu...Read more
July 5, 2004 • 50m
The kitchen floor needs further excavation, work continues on the new staircase, and the conservatory floor base is poured. Tips o...Read more
July 6, 2004 • 50m
Progress on the back garden and front brickwork facing, the staircase construction continues, and the old window is removed ready ...Read more
July 7, 2004 • 50m
Progress on the porch and kitchen wall removal, how to prepare a wooden floor for tiling, and an explanation of how to survey your...Read more
July 8, 2004 • 50m
Progress on the staircase and kitchen wall removal. With tips on fixing a bannister, replacing a damaged doorframe, removing a hot...Read more
July 9, 2004 • 50m
Progress on the kitchen and wall removal, fitting the new heating system, and loft insulation. With tips on joining pipework, fitt...Read more
July 12, 2004 • 50m
Progress on the kitchen, bedroom cupboard wall removal. Tips on plastering techniques, removing an internal wall, a brush mastercl...Read more
July 13, 2004 • 50m
Progress on the kitchen, guttering, and how to construct a stud partition wall. Tips on plasterboarding a ceiling, replacing gutte...Read more
July 14, 2004 • 50m
Update on the kitchen, rendering and garden, with various home security and safety ideas, including a step-by-step guide on how to...Read more
July 15, 2004 • 50m
Progress on the kitchen installation, the porch roof, rendering, the staircase and the garden soakaway. Tips on mixing plaster and...Read more
July 16, 2004 • 50m
The conservatory construction starts and there's updates on the bedroom renovations, rendering, fitting the kitchen units and porc...Read more
July 19, 2004 • 50m
Ann-Marie Powell explains the garden design, and there's updates on the conservatory construction and the kitchen unit installatio...Read more
July 20, 2004 • 50m
General update on the work so far, with tips on installing an outside power socket, fitting kitchen door hinges, false door fronts...Read more
July 21, 2004 • 50m
The team finish off the porch roof and there's updates on the mains water, living room, kitchen and conservatory. Plus tips on how...Read more
July 22, 2004 • 50m
Updates on the porch doors, kitchen, heating system, outside, and work starts on the bathroom and soil stack pipework. Tips on how...Read more
July 23, 2004 • 50m
Ann-Marie Powell visits to see how the outdoor work is progressing and draw out the plans for the garden, the living room window i...Read more
July 26, 2004 • 50m
The topsoil is delivered, the conservatory french doors are fitted, and the living room doors are installed. There's tips on fitti...Read more
July 27, 2004 • 50m
There's updates on the conservatory, living room and outdoor groundwork, the loft, and a visit from a chimney sweep. Tips on sandi...Read more
July 28, 2004 • 50m
Updates on the patio foundation, conservatory, bathroom, and the hot tub is installed. Tips on fitting coving, repairing wall dama...Read more
July 29, 2004 • 50m
There's an update on the outside ground work, the conservatory flooring is laid, the garden deck base is built, and the pond liner...Read more
July 30, 2004 • 50m
The driveway is installed, the path is started, garden decking is put down, and further work done on kitchen. Tips on installing g...Read more
August 2, 2004 • 50m
Updates on the brick path, garden pond, conservatory radiators, bathroom, and rooms are plastered and filled. There's tips for pai...Read more
August 3, 2004 • 50m
The chimney flue is installed and new fireplace unveiled, and updates on the paths. Tips on making a door for an under-stairs cupb...Read more
August 4, 2004 • 50m
There's loads of general finishing off, the paths are completed, wall lights installed, and a final "before and after" tour of the...Read more